CII - Indian Green Building Council (IGBC)
CII - Indian Green Building Council (IGBC)
Sewage Treatment Plants (STPs)
This project is located in Hyderabad City of Telangana state. The latitude and longitude of the STP is 17°27'25.38"N 78°22'27.08"E.
The system has a capacity of 5 KLD.
The plant receives wastewater from offices.
The inlet wastewater has a BOD, COD and TSS of 125, 150 and 10 mg/L.
A Hybrid Sub-surface Flow was installed.
The BOD, COD and TSS removal efficiency of the STP is greater than 98% throughout the year.